Track my pre-order
Enter your order number to follow your pre-order's progress, step by step.
Which drop did you order?
Series 1
Orders from August 5 to August 9
Estimated shipping
September 5
-
Order receivedYour reservation is confirmed.
-
Fabric received10 aoûtThe fabric arrives at the workshop.
-
Production started12 aoûtManufacturing begins.
-
Embroidery17 aoûtEmbroidery and finishing applied.
-
Quality control18 aoûtEvery piece is checked.In progress
-
Preparation & shipping24 aoûtPacking and handover to the carrier.
-
Shipped5 septembreYour parcel is on its way.
Series 2
Orders from August 10 to 17
-
Order receivedYour reservation is confirmed.
-
Fabric receivedThe fabric arrives at the workshop.
-
Production startedManufacturing begins.In progress
-
EmbroideryEmbroidery and finishing applied.
-
Quality controlEvery piece is checked.
-
Preparation & shippingPacking and handover to the carrier.
-
ShippedYour parcel is on its way.
Series 3
Orders from August 18 to 24
-
Order receivedYour reservation is confirmed.
-
Fabric receivedThe fabric arrives at the workshop.In progress
-
Production startedManufacturing begins.
-
EmbroideryEmbroidery and finishing applied.
-
Quality controlEvery piece is checked.
-
Preparation & shippingPacking and handover to the carrier.
-
ShippedYour parcel is on its way.
Série 4
Commandes du 24 août au 30 août
-
Order receivedYour reservation is confirmed.In progress
-
Fabric receivedThe fabric arrives at the workshop.
-
Production startedManufacturing begins.
-
EmbroideryEmbroidery and finishing applied.
-
Quality controlEvery piece is checked.
-
Preparation & shippingPacking and handover to the carrier.
-
ShippedYour parcel is on its way.
Any other questions? Contact us at contact@cynique.co